• Location: Austria

  • Client: OMV

As part of the expansion of the existing central extraction station in Schönkirchen, an additional tank, pipes and a separator were built to separate gas, water and oil. All the necessary systems such as piping, electrical engineering, instrumentation and control engineering, civil engineering and steel construction were incorporated into the existing systems and integrated in terms of safety.