• Project Location: Austria

  • Auftraggeber: Trans Austria Gasleitung GmbH, Austria

At the site of the Baumgarten gas station, the existing office building from 1973 was demolished and a new modern office and service building was erected. The existing control room was retained and reconnected to the new building. The facade of the control room was provided with a sheet metal facade (not thermally effective) in consistence with the one of the new building.