• Project Location: Austria

  • Client: GAS CONNECT AUSTRIA GmbH

Dismantling and reconstruction of a high-pressure natural gas pipeline G00-011 DN300, PN70, with a length of 51 km.
A high-pressure pipeline was laid in three sections in the northern Weinviertel region and put into operation after integrating sections that had already been renewed. In the built-up area as well as at various bottlenecks, rerouting was necessary.