Along the A 13 Brenner freeway, among other things, the repair work between Innsbruck South and the Europabrücke bridge was accompanied as part of the construction management activities. The BERNARD Gruppe is also entrusted with the execution of traffic surveys and the operation of measuring equipment for monitoring deformations on the Europabrücke.