• Location: Austria

  • Client: Innsbrucker Kommunalbetriebe Aktiengesellschaft, TIGAS-Erdgas Tirol GmbH and the City of Innsbruck

The waste water disposal plant, the water supply plant, gas supply lines, telecommunication facilities and the electrical power supply will be relocated or newly built in Downtown Innsbruck. The reason for the overall measure is the need to renew the drinking water supply.