Due to the complexity of the project, special challenges arose, for example in the calculation and planning of the inner shell. The documents for the construction tender and the execution of a construction section were prepared under consideration of different tunnelling methods. The support of the construction work as geotechnical engineer on site, for both cyclical and mechanical driving sections was technically challenging.