Project Description
Project Location: Bhutan
Client: Federal Ministry for Foreign Affairs / Republic of Austria and Ministry of Trade and Industry / Royal Government of Bhutan
For the 24 MW hydropower plant in Bhutan, an open-air plant and its switching, control and monitoring equipment had to be integrated into the national SCADA visualisation system in order to feed the generated energy into the national grid.