• Location: Germany
  • Client: ÖBB Infrastruktur AG (Austrian Federal Railways), Austria

The continuing free section between Rankweil and Feldkirch was renewed in two phases. The Feldkirch-Amberg stop was also rebuilt in the course of the new track installation.