• Location: Austria

  • Client: ASFINAG

The safety upgrade of the A7 Mühlkreisautobahn in Linz includes the construction of the new bypass bridges to the Vöest bridge over the Danube. A particular highlight of the construction work was the floating in of the up to 1,500 tonne bridge sections of the steel construction.