Home>News

News

Reconstruction of the tram and bus stop at Heidelberg Central Railway Station

The planned changes in the traffic guidance of public transport and motorized individual transport were implemented at Heidelberg Central Station. In connection with the traffic lights as well as the signage and markings, the design of the traffic guidance during the construction period and after completion of reconstruction was prepared. The tram and bus stop of Heidelberg Central Station [...]

2019-10-22T15:03:32+02:0022.10.2019|

Six-lane extension and “reunification” of the English Garden, Munich/Germany

The English Garden is divided into a north and a south part by the 4-lane Isarring, a section of the Middle Ring road around Munich. The lowering of the Isarring will reunite the two halves of the park. The English Garden, centrally located in the Bavarian state capital of Munich, is an important listed landscape park, is part of [...]

2019-10-07T14:02:34+02:0029.08.2019|

Vibration measurements during the construction of the Wieselburg bypass

RED Bernard is currently carrying out vibration measurements during the construction of the Wieselburg bypass in Lower Austria. In the course of the more than 5 years long construction period, different tasks have to be mastered from a vibration point of view. Even before construction began, the condition of the neighboring buildings was surveyed by means of crack mapping [...]

2019-09-19T13:48:02+02:0029.08.2019|