The new construction of the Mils Inn Bridge will not only renew an important transport link but also bring about a lasting improvement in flood protection along the River Inn. The BERNARD Gruppe supported the project with comprehensive planning services.
A new bridge over the River Inn is being built along the B171 Tiroler Straße, on the border between the municipalities of Mils bei Imst and Schönwies. Raising the bridge and the adjacent road structure will increase the flow cross-section, thereby improving flood safety along the river. The existing bridge was demolished due to its age and structural condition and is currently being replaced by modern new construction. The future integrated bridge will have three spans. Plans include a 7.50-metre-wide roadway, a footpath on the upstream side and a combined footpath and bike path on the downstream side. The BERNARD Gruppe was responsible for the project’s all design phases and provided the engineering services from the preliminary draft, conceptual design through the detailed design. Forward-thinking and cost-effective all design phases laid the foundations for the successful implementation of this infrastructure project
The new construction will create an efficient and future-proof link that meets both the requirements of road traffic and the challenges of flood protection.
Christian Wollinger, BERNARD Gruppe
Foto ©: Amt der Tiroler Landesregierung