The BERNARD Gruppe has been commissioned to plan a double-track extension south of Bürmoos. The aim is to adapt the planned infrastructure to future operational requirements and to refine the technical details.
The focus of the project is on the addition of a second track, all design phases for additional track switches and the design of the line for speeds of up to 100 km/h. Building on the existing study, the measures will be evaluated, further developed and integrated into a coherent planning concept.
With our many years of experience in all design phases for rail infrastructure, the BERNARD Gruppe is contributing to the sustainable development of high-performance railway lines.
Peter Kastner, BERNARD Gruppe