The BERNARD Gruppe was commissioned by the Berliner Verkehrsbetriebe (BVG) with the project planning of the transport infrastructure for the upgrade of the Paulsternstraße subway station.
As part of the project, BVG is planning to build a second exit and an elevator at the listed station building to ensure barrier-free access and increase the safety of the facility. In addition, the existing transport infrastructure will be adapted and the streets will be redesigned by the BERNARD Gruppe in an ecological, sustainable, and socially valuable way. Particular emphasis is being placed on minimizing disruption to passenger services and maintaining traffic flows on the road.
The contract awarded to the BERNARD Gruppe comprises basic evaluation, preliminary design, and final design.
Matthias Hermann, BERNARD Gruppe