During soil investigations, soil samples will be taken using various devices to draw conclusions for further planning of the power line.
The samples collected by the drillers on site will be sent to the laboratory for more detailed analysis. The geotechnical report will then be drawn up. This report will be the basis for deciding how the underground cable must be laid and how the pylons must be founded.
Marlen Strasser, BERNARD Gruppe