The BERNARD Gruppe has been commissioned by Stadtwerke München with the planning services for the construction of the new tram depot in Ständlerstraße.
Stadtwerke München (SWM) is building a new streetcar depot for Munich on Ständlerstraße. The new building is necessary to ensure reliable streetcar operations in the future. Expanding the capacity of the streetcar depots is also a prerequisite for the expansion of the tram network that has already been decided.
The commissioned planning services range from preliminary planning, design and approval planning to the preparation of implementation documents and construction phase planning. A total of 10,500 m of track, 89 switches and 37,500 m² of roads / paths and parking spaces are being planned. With its services, the BERNARD Gruppe is contributing to the traffic turnaround in Munich.
Andreas Burkhardt, BERNARD Gruppe