The BERNARD Gruppe was commissioned by TenneT TSO GmbH to prepare a drilling concept (exploration concept) for the the detailed site investigation A042.

The A042 project is a replacement construction of a 380kV line. The project comprises two sections with a total route length of approx. 70 km. The BERNARD Gruppe will develop a drilling concept (exploration concept) on the basis of the preliminary site investigations, which were also carried out by the BERNARD Gruppe. For the preparation of tender documents, a quantity estimate for overhead lines and underground cables will be elaborated, the exploration points for the boreholes will be determined and detailed drawings will be prepared. Site inspections will also be carried out to check the feasibility of the planned measures.

Benjamin Wieser, BERNARD Gruppe