As a result of Covid 19, the Innsbrucker Kommunalbetriebe Aktiengesellschaft, TIGAS Erdgas-Tirol GmbH and the City of Innsbruck are implementing a concentrated renovation schedule of the infrastructure facilities.

Due to the current COVID-19 situation, the Innsbrucker Kommunalbetriebe Aktiengesellschaft, TIGAS Erdgas-Tirol GmbH and the City of Innsbruck have decided to carry out the necessary reallocations or the new construction of the infrastructure facilities in the old town of Innsbruck at several locations simultaneously. In this way, multiple excavations, such as backfilling at the end of the year and reexcavation in the following year are avoided and the impact on businesses is minimized.

The waste water disposal plant, the water supply plant, gas supply lines, telecommunication facilities (Magenta and A1-telecom) and the electrical power supply will be relocated or newly built. The reason for the overall measure is the need to renew the drinking water supply.

BERNARD Gruppe has been commissioned with the design and site supervision services of the subarea Herzog-Friedrich-Straße/Seilergasse.

Wolfgang Holzer, BERNARD Gruppe